All concrete will be charged a Variable Fuel Surcharge. This surcharge is based on the average quarterly diesel rack rate, and will be adjusted the 1st day of every month, based on the previous month’s average rack rate. The surcharge will be adjusted as outlined in the table below. Rack Rate Fuel Surcharge <$0.67/L $0.00/m3 […]
Thermalcrete is a Dufferin Concrete technology designed to face cold weather site conditions and provide the same characteristics as our standard concrete in cold weather. Thermalcrete normalizes the setting time to about the same time as concrete that is subjected to a temperature of 20°C. New at Dufferin Concrete is Thermalcrete -15°C. This solution now […]
Earlier this year, Dufferin Concrete hosted a Fibrestrand Demonstration Day in both the Metro and West regions. These demonstrations were on the usage of Macro Structural Fibres replacing Welded Wire Mesh (WWM) and 10M rebar. Guests joined at the Markham and Kitchener concrete plants, where they were able to examine the finished appearance of 2.4kg/m3 […]
Variable Fuel Surcharge
All concrete will be charged a Variable Fuel Surcharge. This surcharge is based on the average quarterly diesel rack rate, and will be adjusted the 1st day of every month, based on the previous month’s average rack rate. The surcharge will be adjusted as outlined in the table below. Rack Rate Fuel Surcharge <$0.67/L $0.00/m3 […]
Thermalcrete -15°C
Thermalcrete is a Dufferin Concrete technology designed to face cold weather site conditions and provide the same characteristics as our standard concrete in cold weather. Thermalcrete normalizes the setting time to about the same time as concrete that is subjected to a temperature of 20°C. New at Dufferin Concrete is Thermalcrete -15°C. This solution now […]
Dufferin Concrete’s Fibers in Action
Earlier this year, Dufferin Concrete hosted a Fibrestrand Demonstration Day in both the Metro and West regions. These demonstrations were on the usage of Macro Structural Fibres replacing Welded Wire Mesh (WWM) and 10M rebar. Guests joined at the Markham and Kitchener concrete plants, where they were able to examine the finished appearance of 2.4kg/m3 […]